Proof, not promises.
Every figure below traces to a programme artefact — trackers, closeout reports, steercom records and signed references. No invented numbers, no rounded-up glory.

The cyber backlog
24 workstreams. One portfolio. Clean handover.

Keep the tills trading
Five datacentres. Two sites. The tills kept trading.

The VDOM collapse
Eight live domains. One 29-hour collapse. Zero escalations.

Before the bad day
A second site. Proven in steps. Ready before it was needed.
Card from nothing
Concept to card. One year. Fully operational.

Certify or stop
v4.0 certified. On the deadline. Zero findings.

The premium desk
Premium tier. Dedicated desk. Resolve, not route.

The long-distance move
One province to another. Facility migrated. The second site, standing.

Recover in order
Three platforms. One recovery architecture. Ready to test.

Know before you move
File servers, SharePoint, RDS. Assessed, not assumed. Consolidation deferred.
More case studies are being written up from the portfolio of evidence. Individuals are referred to by role where required; budgets and vendor names are withheld by design.